Tuesday, April 10, 2012

Main floor

The main floor has been completely demo. As you see, the plumbing has been complete for the second floor. The copper pipes supply water to the second floor bathrooms. The PVC pipes are sewage and vent pipes. Some of the floor joints have been destroyed by the previous owner. Also, most of the can lights have been installed on the main floor.


The joints had been damage, need support will be built.


Can light have been installed in the living room








Plumbing for the master bathroom running across the ceiling of the living room.





PVC running across the dining room, ceiling will drop down to accommodate the plumbing.

No comments:

Post a Comment